Projects

To Bid on Projects please visit City of Ogden Purchasing Homepage link for active bid openings.

       Purchasing Homepage


FUNDED PROJECTS


  • Maintenance Complex & West Side of Airport Improvements.
    • Under Design - June 2021 - January 2022 
    • Out for Bids - February 2022
    • Construction Start - May 2022
      • Grading / Cleanup - Completed November 2022
      • Utilities Upgrade (Gas, Sewage, Power, Water and Telecommunications) On-going during 2023
      • Creation of West Side Entrance Road - Completed November 2022 
    • Schedule for Completion - December 2023
  • New 120 foot Air Traffic Control Tower to replace the 64 foot Tower (FAA 100% Funded and Project Managed)
    • Timeline - November 2022 - TBD 2025
    • Location Siting - November 2022
    • Design of 120 foot Tower - 2024
    • Construction - 2025
    • Completion - 2026
  • $6.2 Million Expansion of Airport Terminal
    • Timeline - September 2021 - October 2024 
    • Design - September 2021 - March 2023
    • Out for RFQ for Construction Manager General Contractor - April 2022
    • Construction - June 2022 - October 2024
      • RESTAURANT WILL REMAIN OPEN FOR ALL CONSTRUCTION PHASES
      • Phase 1 
        • Widen the Terminal Access Road for both entering and exiting vehicle traffic.
        • Remove the existing round-a-bout and replacement it with multiple one-way lanes for loading and unloading with a crosswalk and dividing island
        • New underground conduit will be installed to allow future electrical services in the public pay parking lot, such as lighting.
        • Construct a new baggage claim room on the east facing front of the terminal building
        • Inside the new baggage claim room, there will be room for three car rental companies, a baggage office, an information counter, and a family restroom.
        • The two existing ADA restrooms will be removed to allow for a new fire-code required exit path out of the building
        • Two new ADA restrooms will be constructed where the previous Hertz Car Rental Counter was located.
        • The old OGD Airport Administrative Offices will be demolished and replaced with multiple airline check-in ticket counters and the roller tables for moving the airline passenger checked baggage to TSA screening.
        • The lobby area underlying tile has tested positive for asbestos and all will be removed and properly dealt with.
        • All lead based paint will be removed and properly dealt with.
        • The new TSA passenger screening checkpoint will be constructed.
        • The terminal building basement will be demolished and a large open meeting room will be constructed.
        • Two basement restrooms will be restored and remodeled.
        • The beginning structural work for a three landing elevator will be constructed. The elevator itself will be installed in Phase Two.
    • Schedule for Completion - Phase 1 October 2024 
      Terminal Expansion CMGC RFP Appendix A_Page_1 Opens in new window
      Terminal_Front Opens in new window
      Terminal_interior_1 Opens in new windowTerminal_interior_2 Opens in new window

Other Misc. Projects

  • Replacement of Windsocks and Lighting - COMPLETED JUNE 2023
    Wsock_new_2023 Opens in new windowwindsock_New_2023 Opens in new window
  • Upgrade of Segmented Circle - COMPLETED JUNE 2023 segmented_Circle_2023 Opens in new window
  • Utah 99's Painting of 80 foot diameter Compass Rose - COMPLETED JUNE 10, 2023compass_rose_june2023 Opens in new window

COMPLETED PROJECTS

2022

  • Replacement of Antiquated Airport Generator with Larger Capacity Generator
    • Schedule for Completion - April 2022
    • COMPLETED APRIL 2022
  • Replacement of Hangar 755 Roof
    • Out for Bids - March 2022
    • Construction - June 2022
    • Schedule for Completion - September 2022
    • COMPLETED SEPTEMBER 2022
  • Repair Pilot Control Lighting System Multiple Level Light Intensity 
    • Installation - November 2021
    • Schedule for Completion - Mid-December 2021
    • COMPLETED MARCH 2022 
  • Demolition of Hangar N-850
    • Out for Bids - October 2021
    • Demolition - Mid-January 2022 
    • Scheduled for Completion - March 2022
    • COMPLETED MARCH 2022
  • Remodel of Restaurant in Terminal
    • Design - Completed August 2021
    • Out for Bids - September 2021
    • Construction - October 2021
    • Schedule for Completion - March 2021
    • COMPLETED APRIL 2022

2021

  • Demolition of Old Tower on Top of Terminal Building. 
    • COMPLETED AUGUST 2021
    • Time Lapse Video of Removal of Old Air Traffic Tower - Click Here
  • Demolition of Hangars N-420, S-543, S-553, & N-850. 
    • COMPLETED JUNE 2021
  • Construction of Fiber Optic Network Loop Around OGD Airport for Internet Access / Data Transmission.
    • Out for Bids - June 2021
    • Construction Started - August 2021
    • Scheduled for Completion - January 2022
    •  COMPLETED DECEMBER 2021 
  • Construction of New Partial Parallel Taxiway Foxtrot, West of Approach End of Runway 17.
    • Design - December 2021 See Diagram below
    • Out for Bids - March 2022
    • Construction - May 2022
    • Schedule for Completion - December 2022
    • COMPLETED DECEMBER 2022
      Google_WestSide Opens in new windowWest Side Before
      New_Taxiway_West_Hangar Opens in new window
      New Taxiway F &
      West Side Ramp Access
      Westside2 Opens in new windowWest Side
      Before & After
      West Exhibit Opens in new windowWest Side Ramp

  • OGD AIRPORT NORTH TIE-DOWN APRON RECONSTRUCTION, SCHEDULE II - COMPLETED DECEMBER 2021 
    • Granite Construction is scheduled to begin the second half of the North Tie-Down Apron Reconstruction on Tuesday June 1st, 2021. 
    • Phase One - June 1st - July 19th
      • The pavement will be removed airside of four hangars. Each of these hangar owners & users should make arrangements to not have aircraft access in or out of their hangars between June 1st and July 19th.
      • Affected Hangars - N-1302, the northmost bay only, Hangar N-1410, Hangar N-1460, and Hangar N-1504.
    • Phase Two - July 19th - August 3rd
      • Twenty one (21) hangars will lose the ability to get an aircraft from their hangar to the Runway & Taxiways. Each hangar owner or user will need to make arrangements to not have aircraft access in or out of their hangars between July 19th and August 23rd. 
      • Affected Hangars - Hangar N848, Hangar N-824, Hangars N-946, N-942, N-936, N-930, N-924, N-918, N-1038, N-1034, N-1028, N-1022, N-1016 & N-1010, Hangar N-916, Hangar N-1004, Hangar 1108, Hangar N-1116, Hangar N-1110, Hangar N-1204, and Hangar N-1302.
    • Additional time will be required to core the tie-down anchor points and to paint in the striping and the tie-down "T's". 
    • These dates represent the best estimates for each phase, but the actual times could vary somewhat. 

OGD North Apron Phasing Plan May 2021 (1) Opens in new window